Burley Bank has the potential to create a well-connected new community, centred around green spaces and with access to community facilities and small-scale employment opportunities. The proposals could also deliver a wide range of much-needed new homes to help address the chronic shortage of high-quality and affordable housing, while meeting the needs of people at different stages of life.
This is a long-term vision, and we are gathering initial feedback to help shape the proposals as they develop. We encourage you to review our consultation materials and share your views by completing our online survey.
Hallam Land specialises in the promotion of strategic land for development and has been active across England, Wales and Scotland for over 36 years. Hallam Land is one of the leading strategic land promoters in the UK, and has delivered an extensive range of strategic developments across the country, including residential, commercial, retail and infrastructure projects. Hallam Land works proactively and undertakes detailed local analysis to ensure that developments are proposed in the most sustainable and suitable locations, reflecting local needs and creating places where people want to live.
The site covers approximately 73.84 hectares in a well-connected location east of Burley Bank Road and west of Oaker Bank, Harrogate. It is to the North West of Harrogate, which has been identified by North Yorkshire Council as one of the two primary settlements alongside Scarborough, indicating it is a highly sustainable location for new development.
The site is not identified as Green Belt or within a Special Landscape Area in the adopted Harrogate Borough Council Local Plan.
It is also close to existing employment and community facilities including Saltergate Business Park (north west), Harrogate West Business Park (south west) and Hildebrand Barracks (Army Foundation College) (south).
The site benefits from existing bus connections to Harrogate, as well as nearby walking and cycling routes, providing opportunities for sustainable and active travel.
A Public Right of Way currently crosses the north-western part of the site, providing an existing recreational connection.
North Yorkshire has an annual housing target of over 4,000 new homes, and Harrogate district can only demonstrate a five-year housing land supply of around 2.84 years. In addition, the wider North Yorkshire Council area can only demonstrate 2.26 years of deliverable housing land. This means there is a shortfall in housing delivery in the Harrogate district, alongside an acute requirement across the wider North Yorkshire Council area.
Harrogate has been identified by North Yorkshire as one of the two Primary Settlements within the settlement hierarchy for the Emerging Local Plan, alongside Scarborough. Burley Bank, Harrogate is well placed to help improve and support local infrastructure, to ensure the long-term viability of Harrogate town centre.
Burley Bank demonstrates a long-term vision for delivering new homes at scale alongside supporting community infrastructure, carefully designed green spaces and well-connected places where people want to live.
Our vision for Burley Bank is a connected, sustainable and well-designed new community that responds to the site’s character and integrates with its surroundings.
Burley Bank’s scale presents an opportunity to deliver new homes for people at different stages of life, alongside supporting community infrastructure, helping create a sustainable new community. The proposed residential led mixed-used sustainable urban extension could also provide small-scale employment space, supporting local businesses to grow and creating opportunities for economic investment.
We are at an early stage in the process, with an outline planning application being prepared. This is an opportunity for local people to help shape the proposals, influence how spaces and facilities are brought together, and ensure local priorities are responded to. Please review the initial proposals and share your thoughts.
The proposed landscape led design has been informed by numerous technical surveys and previous input from local stakeholders. The proposals include:
Up to 1,100 new homes including a mix of housing for growing families, first-time buyers and older people
40% affordable homes to help address Harrogate’s chronic housing crisis, especially for young people
Land for a primary school, if required, to ease pressure on existing schools and reduce the need to travel further afield
A flexible local centre providing community facilities and services and ancillary retail uses located at the site frontage on Oaker Bank. We are keen to hear thoughts about how the local centre space can be best utilised
Employment space to support new jobs and the local economy
Around 40% green or open space including formal play areas, new woodland, landscaping and attenuation ponds
Over 10% biodiverstiy net gain provided on site, benefiting both new and existing residents
New walking and cycling routes including circular routes and trim trails, connecting with existing routes in Harrogate
A new bus link linking Oaker Bank and Burley Bank Road onwards into Harrogate. This ensures most residents would live within 400m of a bus stop
Two access points from Oaker Bank including primary and emergency access, alongside access from Burley Bank Road
North Yorkshire has an annual housing target of over 4,000 new homes, and Harrogate district can only demonstrate a five-year housing land supply of around 2.84 years. In addition, the wider North Yorkshire Council area can only demonstrate 2.26 years of deliverable housing land. This means there is a shortfall in housing delivery in the Harrogate district, alongside an acute requirement across the wider North Yorkshire Council area.
Harrogate has been identified by North Yorkshire as one of the two Primary Settlements within the settlement hierarchy for the Emerging Local Plan, alongside Scarborough. Burley Bank, Harrogate is well placed to help improve and support local infrastructure, to ensure the long term viability of Harrogate town centre.
The application will be submitted in Outline with detailed access to, but not within, the site, so there will be no fixed housing mix for the scheme. The proposals will encourage the eventual developer to include a mix housing typologies and tenures to meet local housing needs and the developer shall design the site in accordacne with apprvoed parameters which shall be conditioned should the site achieve outline planning permission.
New homes would only be delivered following the approval of Reserved Matters Application. Hallam’s current programme indicates that the first homes on the site could be delivered in late 2030, should outline planning permission be obtained.
An Outline Planning Application is being progressed, with submission later in 2026. The Outline Application would agree the principle of development at the site and access. Other matters like scheme layout, home styles, and landscaping would be agreed as part of a Reserved Matters Planning Application. Residents would be able to comment again on the detailed scheme at that stage.
New homes would only be delivered following the approval of Reserved Matters Application. Hallam’s current programme indicates that the first homes on the site could be delivered in late 2030, should outline planning permission be obtained.
A full suite of ecological assessment have been undertaken as part of the planning application preparation to understand the existing habitats and wildlife present on the site.
Developments are required to achieve a minimum of 10% Biodiversity Net Gain either through on-site or off-site mitigation.
Both a Transport Assessment and a Travel Plan is being undertaken for the site, which will both review the current highways impacts and how the scheme can mitigate against these impacts.
The Burley Bank proposal represents a significant opportunity to deliver a residential led mixed-use sustainable urban extension to the north west of Harrogate. This public consultation on the Outline Planning Application seeks to agree the principle of development at the site and detailed access to, but not within, the site with further details around home types and design to follow in a Reserved Matters Planning Application. Residents will be able to comment on the detailed plans at the Reserved Matters stage.
The below timeframe is a guide and subject to change.
Pre-application public consultation – Autumn 2026
Outline Planning Application submission – Late 2026
Planning decision from North Yorkshire Council – expected in 2027
If approved, Reserved Matters Planning Application to follow
Development could begin 2030, with dwellings delivered in late-2030 (TBC, based on the above timescale)
If you have any queries, please contact us on
Please share your thoughts about the proposed development.
Having problems viewing the form? Click here